Somebody has to decide how the building should behave

Controls Design

CONTROLS DESIGN

The Rulebook Your Building Runs On

Before anything gets installed, somebody has to write down what the building is supposed to do.

What temperature each space holds, and when. What happens at six on a Monday morning versus six on a Saturday evening. What the system does when a sensor fails, when the fire alarm trips, or when it’s twelve degrees outside and the building is still full of people.

That document is called a sequence of operations. It becomes the rulebook your building runs on for years to come.

CIMCO Building Solutions writes those sequences — and reviews the ones other people wrote — before equipment is ordered, while changes are still easier and less expensive to make.

CONTROLS DESIGN CAPABILITIES

Designing How the Building Should Operate

A strong controls system starts with a clear sequence of operations. CIMCO Building Solutions develops the control strategy that defines how mechanical, electrical and lighting systems should respond under normal operation, changing occupancy, equipment failures and other building conditions.

Sequence of Operations
Define how equipment and systems should operate, respond and interact under different building conditions.

Mechanical Systems
Coordinate control strategies for air-handling equipment, terminal units, pumps, boilers, chillers and related HVAC systems.

Electrical & Lighting Integration
Align electrical and lighting schedules with mechanical system operation so the building works as one coordinated system.

Controls Review
Review drawings, equipment schedules and control specifications to identify gaps before equipment is ordered or installed.

System Response & Safeties
Define how the system should respond to alarms, sensor failures, fire alarm conditions and other abnormal operating events.

DESIGN BEFORE INSTALLATION

Make the Decisions Before the Equipment Is Ordered

Controls design is where the building’s operating strategy gets worked out before installation begins.

CIMCO Building Solutions reviews mechanical drawings, equipment schedules, points lists and control requirements to identify gaps, conflicts and missing sequences while changes are still easier and less expensive to make.

MECHANICAL + ELECTRICAL + LIGHTING

Electrical and Controls Should Work Together

A controls sequence cannot stop at the mechanical system. Lighting schedules, electrical systems and HVAC operation all affect how the building actually performs.

CIMCO Building Solutions develops control strategies across those systems so schedules, equipment response and building operation work together instead of competing with one another.

Mechanical Systems
Coordinate HVAC equipment operation, schedules, setpoints and system response.

Electrical Systems
Account for power, equipment interlocks and electrical requirements that affect control operation.

Lighting Integration
Coordinate lighting schedules and occupancy strategies with HVAC and building operation.

System-Wide Sequences
Develop sequences that treat the building as one coordinated system rather than isolated pieces.

PLAN YOUR CONTROLS DESIGN

Need Help Defining How the Building Should Operate?

Whether you are planning a new control system, reviewing project documents, developing a sequence of operations, or trying to resolve gaps before equipment is ordered, CIMCO Building Solutions can help define the right control strategy.